This Property is not advertised at the moment
Two villas under construction with a sea view
€1 000 000
ID 86569
Uploaded 07.03.2025
Key features
1.50 km
to sea
Details
Property description
Two villas under construction located in Beci'ci (municipality of Budva), offering a unique view of the open sea, Budva, the island of St. Nikola and the beautiful Beci'ci beachn
The beach is only 1.5 km from the villa, close to the picturesque forest and Chuchuci waterfalls.n
The total area of the plot under the villas is 888 m^2.n
Villa «A» with an area of 212m^2 consists ofn
SPA-center, technical room and storeroom on the ground floorn
living room with kitchen and guest toilet + large terrace on the 1st floor.n
3 bedrooms and two bathrooms on the 2nd floorn
Villa «B» with an area of 212m^2 consists ofn
wine room, technical premises and storage room on the ground floorn
living room with kitchen and guest toilet + large terrace on the 1st floorn
three bedrooms and two bathrooms on the 2nd floorn
A swimming pool (9x4 m) and a garage for 2 cars and a parking lot for 3 cars will be installed in front of each villa.n
The price includes the plot, construction and equipment of both villasn
Completion of construction is planned for the beginning of 2026
The beach is only 1.5 km from the villa, close to the picturesque forest and Chuchuci waterfalls.n
The total area of the plot under the villas is 888 m^2.n
Villa «A» with an area of 212m^2 consists ofn
SPA-center, technical room and storeroom on the ground floorn
living room with kitchen and guest toilet + large terrace on the 1st floor.n
3 bedrooms and two bathrooms on the 2nd floorn
Villa «B» with an area of 212m^2 consists ofn
wine room, technical premises and storage room on the ground floorn
living room with kitchen and guest toilet + large terrace on the 1st floorn
three bedrooms and two bathrooms on the 2nd floorn
A swimming pool (9x4 m) and a garage for 2 cars and a parking lot for 3 cars will be installed in front of each villa.n
The price includes the plot, construction and equipment of both villasn
Completion of construction is planned for the beginning of 2026