Apartments in a new complex from the developer
Key features
Details
Property description
We offer for sale apartments in a new project in Sunny Beach
The plot for the construction of the complex is located in Sunny Beach, just 200 meters from the sand dunes and the wide southern beach. A six-story building in a modern style will be built on an area of 4020 m2.
The project of the complex is designed with an emphasis on the use of high quality materials, a sophisticated exterior and interior that exude style and comfort. This investor's idea is the perfect combination of functionality, quality and convenience. The facades will be faced with stone, which gives the building a monumental appearance. Large windows allow maximum use of natural light.
The building consists of a total of 109 apartments
— 20 studios, costing from 76,500 euros
— 74 two-room apartments, costing from 79,900 euros
— 12 three-room apartments from 144,900 euros and 3 four-room apartments.
The building is divided into 2 sections - A and B. Buyers can choose from apartments of different layouts and sizes overlooking the pool or garden. On the ground floor of the building there will be a reception and the developer's office.
It is also planned to build underground parking and storage rooms on level -1, and there will also be open parking. Future owners of the apartments will be able to purchase a storage room, open or underground parking space if they wish.
At the center of the project there will be a sunbathing and relaxation area with sun loungers, a swimming pool for adults and a children's pool. Among the features of the complex are rich landscaping, an outdoor children's playground, parking for bicycles, a guarded area with controlled access and, of course, the location - only 200 meters from the beach.
All apartments will be delivered fully furnished on a turnkey basis. Until 12.2025, each client will be able to additionally order a package of furniture and household appliances in accordance with the design proposed by the investor.
START OF CONSTRUCTION - 01.2025
CONSTRUCTION DURATION – 30 MONTHS
Payment scheme: 10% deposit, 40% - January 2025, 30% - January 2026, 20% - March 2027