3 Bedroom Oceanfront Apartment
Key features
Details
Property description
The complex consists of four five-story buildings. In total, the complex has 157 apartments from 1 to 5 bedrooms. All apartments are equipped with full kitchens and spacious balconies with panoramic views.
Some apartments have private terraces with a swimming pool or jacuzzi. These additional features allow residents to experience exclusive luxury and comfort.
The Marina Douro project has been designed to offer all the necessary elements for a comfortable family life. Residents will have access to a garden and children's play area common to all buildings, which will help create an atmosphere of unity and friendship between families. In addition, all apartments include private parking spaces in the building's own garage.
The first phase of the project is Marina Douro 1, which has 26 apartments.
The apartment in question has the following characteristics:
- Open plan living, dining and kitchen area of 42.8 m2;
- Suite with an area of 15.1 m2 with a bathroom of 4.6 m2;
- Shared bathroom with an area of 3.0 m2;
- Bathroom with an area of 1.7 m2
- Balcony with an area of 29.0 m2
- Parking space with an area of 26.3 m2 and a storage room with an area of 6.7 m2.
Located :
- 2 km from the supermarket,
- 2 km from Arrábida shopping center,
- 2 km from the pharmacy,
- 15 km from Porto airport
- 2.5 km from Porto
Technical features:
- Floors in the hall, living room, kitchen and bedrooms are made of oak wood, multi-layered with the last layer of noble wood;
- Suspended ceilings made of plasterboard 13 mm thick.
- Walls made of project plaster "Seraglio" type
- Internal cabinets made of linen melamine, doors made of MDF
- Water-repellent MDF skirting boards
- Heating and cooling using multi-split system with indoor wall units
- Heating of sanitary water using a heat pump
- Video intercom
- Private parking with access to the basement through automatic gates
remote control
-Containers on the sidewalk leading to the complex for separate collection
garbage, glass, paper and packaging materials.
-Condominium living room
-Landscaped open area with a children's playground, recreation areas and gazebos.
Construction is expected to take 30 months and begin in May 2024.