New residential complex near the center of Belgrade
Key features
Details
Property description
The complex is located right on the waterfront in the most iconic area of Belgrade very close to the city center and is easily accessible on foot, by bike, by car and by public transport. On the territory there will be cozy cafes and restaurants, shops and boutiques, a lot of greenery and a park with a children's playground. The developer retains ownership rights to all commercial premises and carefully controls the distribution of premises for their intended purpose and the choice of tenants.
Total in the complex: 322 corner apartments
121 two-sided apartments
102 apartments with private garden
Most buildings have 2 to 4 apartments per floor.
During the construction of the complex, all technical details were thought out: central air conditioning, heated floors, built-in air purifiers, the highest quality materials were used in the apartments, as well as in common areas, while each apartment will have a ceiling height of 2.85–3.20 meters. Geothermal heat pumps will be installed as a source of heating and cooling, which is one of the cleanest as well as one of the most cost-effective energy sources.
Air purifiers that will include HEPA filters as well as activated carbon filters so that the air inside apartments can be purified of harmful particles, bacteria and allergens, as well as unpleasant odors.
Sound insulation is above the standards currently existing in Belgrade.
Your own property management company will be created.
Apartments ranging from one to four bedrooms with high ceilings are available in a variety of layouts and sizes to suit any lifestyle, from 48 sqm apartments, to 320 sqm residences for those who need the most spacious accommodations.
The price range for the project will be from 4,800 euros/sq.m to 6,000 euros/sq.m, and at stage 2 - up to 8,400 euros/sq.m, including VAT, and standard garage spaces will cost from 33,000 to 42,000 euros, including VAT .
The price difference will depend on the view (proximity to the river, height and orientation) and the quality of construction will be the same and consistent with the information we have already provided.
The first phase will include 7 buildings next to the future Linear Park, and the second phase will include the Wave building and 3 buildings next to the river, and bookings are being taken for both phases. Permission for the first phase has already been received and delivery is scheduled for the fourth quarter of 2026, permission for the second phase is expected in the fall of next year, and delivery is scheduled for autumn 2027.