Apartments in a new residential complex project in Burgas
Key features
Details
Property description
The complex, located on an area of almost 9,000 square meters, continues the architectural line and innovative concept of already implemented projects from the developer in a new rapidly developing quarter.
This project provides for two floors with commercial premises, one of which is intended for a grocery hypermarket.
The apartment building will consist of three sections /A, B and C/. The total number of apartments is 196. Each section has a separate entrance and two high-speed elevators. The apartments are designed with precision and are characterized by correct shapes and high functionality of the premises. All apartments are offered in rough finishing (on tapa).
Offered for sale:
– Two–bedroom apartments – priced from 94,000 euros
– Compact three–bedroom apartments (80-85 sq.m.) - priced from 132,000 euros
- Spacious three-bedroom apartments (100-118 sq.m.Moscow) – at a price starting from 165,000 euros
On-site parking is provided for 99 covered underground parking spaces with convenient ramp access and 144 outdoor parking spaces conveniently located around buildings.
The cost of underground parking spaces starts from 20,000 euros, open parking spaces from 15,500 euros.
The exterior space around the buildings is designed with the same care and attention as the interior, and provides residents with opportunities for outdoor recreation, sports, and social activities. A playground, a multifunctional sports field, an outdoor fitness area, and a landscaped park are essential elements of high-class living that are invariably present in all the developer's projects.
Traditionally, the most modern and reliable materials and technologies that have been carefully selected are used in the construction process: composite ceramic and aluminum panels, thermal insulation and energy-saving facade systems, high-quality German carpentry products, etc., which ensures uninterrupted operation and optimal energy efficiency of houses.
Construction starts in October 2026. The term is 36 months.
Installment payment until the end of construction!
Agency: GRAND ESTATES GROUP