One-bedroom apartment in the new maintenance-free Briz 5
€83 500
ID 136005
Uploaded 24.05.2026
Key features
400 m
to sea
25 km to airport
Details
Property description
m
Floor: 2
Maintenance fee: none, condominium ownership
Construction stage: under construction, Act 14
Payment plan: 60% upon signing the preliminary contract, 40% upon receiving Act 16.
We offer a cozy one-bedroom apartment with modern turnkey finishing. The apartment is sold unfurnished, allowing future owners to design the space according to their own taste.
The living areas feature quality finishing: laminate flooring, painted walls in light neutral tones, lighting fixtures, and modern MDF interior doors. The bathroom is fully tiled and prepared for further furnishing.
Briz 5 is a modern project in one of the most attractive areas of Ravda, only 395 meters from the beach. The complex combines a convenient location, functional architecture, and comfortable conditions for year-round living.
The building has four floors, a modern elevator, and underground parking. One of the main advantages is the absence of a maintenance fee.
Construction is currently at Act 14 stage, with completion and commissioning planned for 2027.
Floor: 2
Maintenance fee: none, condominium ownership
Construction stage: under construction, Act 14
Payment plan: 60% upon signing the preliminary contract, 40% upon receiving Act 16.
We offer a cozy one-bedroom apartment with modern turnkey finishing. The apartment is sold unfurnished, allowing future owners to design the space according to their own taste.
The living areas feature quality finishing: laminate flooring, painted walls in light neutral tones, lighting fixtures, and modern MDF interior doors. The bathroom is fully tiled and prepared for further furnishing.
Briz 5 is a modern project in one of the most attractive areas of Ravda, only 395 meters from the beach. The complex combines a convenient location, functional architecture, and comfortable conditions for year-round living.
The building has four floors, a modern elevator, and underground parking. One of the main advantages is the absence of a maintenance fee.
Construction is currently at Act 14 stage, with completion and commissioning planned for 2027.