Two-room apartment in the Izgrev residential complex, Burgas

€138 790
ID 127842 Uploaded 20.03.2026
Key features
Apartments Under Construction Completion in 2029
Details
Landscape design Terrace Park
Property description

We offer a two-bedroom apartment of 75 sq. m in a residential building under construction in the Izgrev residential complex, Burgas. It consists of an entrance hall, a living room with a kitchenette, a bedroom, a bathroom with a toilet, and a terrace.



The buildings are expected to have an internal park, including a children's playground, recreation areas, pedestrian alleys, etc.



The project's concept is to combine a convenient location, a green environment, and a higher construction standard.



Ref. No. 2529


Agency: Avrora Plus
Larisa Kostadinova
Larisa Kostadinova
Agent at Avrora Plus
Speaks Bulgarian
Similar properties
€145 054
70 sq m Floor: 5 Maintenance fee: €0 per year Construction stage: under construction; start — May 2026; completion timeframe — 36 months. Payment...
€138 000
We offer this fully furnished 5 room apartment for sale, situated on the high ground floor of the prestigious Elitonia 2 complex. This well-maintained,...
€139 053
m Floor: 4 Maintenance fee: 0 EUR/year Construction stage: Under construction, completion planned for end of 2028 Payment plan: 3, 000 EUR — deposit...
€135 000
m Floor: 1 Maintenance fee: none Payment terms: 5, 000 EUR reservation deposit, individual payment conditions 100% payment upon signing the notarial deed. We...
€143 943
m Floor: 3 Maintenance fee: none Construction stage: under construction We offer a two-bedroom apartment in the new residential complex “Azimut Ring” in the...
€141 803
m Floor: 3 Maintenance fee: none Construction stage: under construction We offer for sale a 2-bedroom apartment in the new residential complex “Azimut Ring”...
€134 919
01 sq m Floor: 7 Maintenance fee: none Construction stage: Act 14, planned completion – end of 2026 Deposit: 5, 000 EUR, individual payment...
€135 622
38 sq m Floor: 7 Maintenance fee: none Construction stage: Act 14, planned completion – end of 2026 Deposit: 5, 000 EUR, individual payment...
€134 558
82 sq m Floor: 7 Maintenance fee: none Construction stage: Act 14, planned completion – end of 2026 Deposit: 5, 000 EUR, individual payment...
€148 000
m Floor: 5 Maintenance fee: none Construction stage: under construction (start: March 2026; completion: March 2028) Payment terms: €5, 000 deposit; 100% upon signing...
Contact Seller